Kubota WSM OC60-E2 Workshop Manual page 105

Diesel engine
Table of Contents

Advertisement

OC60-E2, OC95-E2, WSM
Magnet Switch (OC60-E2)
1. Check the continuity across the C terminal (1) and the B
terminal (2) with an ohmmeter, pushing in the plunger.
2. If not continuous or if a certain value is indicated, replace the
solenoid switch.
3. Pull the pull-rod to check the spring built in the plunger.
(1) C Terminal
Magnet Switch (OC95-E2)
1. Check the continuity across the C terminal (1) and the B
terminal (2) with an ohmmeter, pushing in the plunger.
2. If it dose not conducts, check the contacts.
(1) C Terminal
S-53
ENGINE
(2) B Terminal
0000009316E
(2) B Terminal
0000009317E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wsm oc95-e2

Table of Contents