Zeppelin PERCOLATOR Assembly Instructions Manual page 22

2 watt tube amp / 1x8 combo kit
Hide thumbs Also See for PERCOLATOR:
Table of Contents

Advertisement

14. Tube socket (Part # SK10):
a. Before installing the tube socket, we need to help prepare it to easily seat the tube. These
sockets come a little tight from the factory, so it is helpful to loosen up the place where the
tube pins fit in.
45
45
b. The tube socket is installed on the solder side of the board. The leads may need to be
pressed in slightly for it to fit in the holes.
that the socket is pushed in as close to the board as possible.
that the top of the socket is parallel to the surface of the board.
47
52
Very gently use your awl to slightly widen each of the 12 pin sockets.
47
22
46
Make sure all the leads are seated firmly and
Double check to make sure
48
48
53
46

Advertisement

Table of Contents
loading

Table of Contents