OPTIONAL POWER FLUE
Installation Instructions
LOCATION OF FLUE TERMINAL FOR POWER FLUE
Listed below are the minimum clearances required for fan-assisted terminations:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
ELECTRICAL
SHOULD THE SUPPLY FLEX AT THE BACK OF THE FIREBOX BE DAMAGED, A SPECIALLY
PREPARED FLEX IS REQUIRED. FOR REPLACEMENT CONTACT THE MANUFACTURER.
THE ON/OFF WALL SWITCH MUST NEVER BE ATTACHED TO A METAL FRAME.
WARNING
Whenever servicing the power flue system, always turn off the electrical power supply and
close the manual gas control valve.
IMPORTANT INFORMATION
In addition to the instructions in this manual all national, state and local regulations must be
adhered to. These include but are not limited to:
• Australian Standards AS3000 - Electrical Installation.
• Australian Standards AS5601 - Gas Installation.
• Local Gas and Electrical Authority Regulations.
• Municipal Building Codes.
The power flue should be serviced every 12 months by an authorised technician. If repairs
are needed an authorised technician must carry them out.
FITTING THE MOTOR
The power flue motor has a 150mm spigot and a twin spigot of 150mm & 200mm. The single
spigot fits over the vertical flue and the 150mm/200mm flue attaches to the horizontal spigot.
FLUE SIZE
All flue prior to the motor is 150mm/200mm twin skin and all flue after the motor is
150mm/200mm twin skin.
(continued)
Below eaves, balconies and other projections. .........................................................200mm
From the ground, above a balcony or other surface. ................................................300mm
From a return wall or external corner..........................................................................300mm
From a Gas meter. ....................................................................................................1000mm
From an electricity meter or fuse box. ........................................................................500mm
From a drainpipe or soil pipe. ......................................................................................75mm
Horizontally from any building structure or obstruction facing a terminal.................500mm
From any other flue terminal. Cowl, or combustion air intake. ..................................300mm
Horizontally from any openable window, door, non-mechanical air inlet,
or any other opening into a building with the exception of sub floor ventilation.......300mm
From a mechanical air inlet including a spa blower.................................................1000mm
Vertically below an openable window, non-mechanical air inlet,
or any other opening into a building with the exception sub floor ventilation. ..........500mm
(continued)
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heatseeker 700Heatseeker 850Heatseeker 1000

Table of Contents