Installing The Rack Brackets; Preparing For The Installation - QUANTA STRATOS S210 Series S210-X12RS Technical Manual

Ultra-socket high memory 1u rackmount server
Hide thumbs Also See for STRATOS S210 Series S210-X12RS:
Table of Contents

Advertisement

R
K
A
AIL
IT
SSEMBLY
6.1 Rail Kit Assembly

Installing the Rack Brackets

CAUTION!
!
B
EFORE REMOVING THE SERVER COVER
U
AC
NPLUG THE
POWER CORD
LAN
.
ALL
LINES
When the server is to be installed into a rack, it is necessary to
install two rack mount brackets onto the server chassis prior to
installing the server into the rack. Follow the procedures below
to install the rack mount brackets onto the server.
,
.
DISCONNECT ALL POWER
;
,
DISCONNECT ALL PERIPHERIALS
AND

Preparing for the Installation

Review all the tasks required to install and configure the
system
Review the electrical requirements and power supply input
voltage information
Examine the system's shipping kit contents and assemble
the required tools for installation
Review ESD requirements and take safety precautions
Before installing the system into a rack, install any optional
components into the system
Stabilize the rack before installing the system, if necessary
WARNING!
!
Use caution when removing the inner rail from the rail kit
assembly. The rails can slide out and cause personal injury or
damage to the server.
6-1
R
K
A
AIL
IT
SSEMBLY

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents