SATO M-5900RV Operator And Technical Reference Manual page 254

Direct thermal printer
Hide thumbs Also See for M-5900RV:
Table of Contents

Advertisement

Appendix F. Factory Resets
Factory Test Print
To initiate a test print, perform the following steps.
STEP
PROCEDURE
1.
Record all current dip switch positions, then place all switches in the O..
position.
2.
Place the DSW2-5 in the ON or up position.
3.
Place the print head in the open position. Keeping both the LINE and
.EED keys depressed, power on the printer.
4.
Upon hearing the audible tone, release the LINE and .EED keys. Place
the print head back in the closed position and DSW2-5 in the O.. or
down position and the display
will change .ROM:
head open
5.
Press the .EED button once. Verify display: "COUNTER CLEAR NON".
6.
Press .EED button to initialize reset. Verify display: ".ACTORY TEST
PRINT.
After a slight pause, a blank label will feed out followed by a factory test
print.
7.
Power O.. the printer and confirm that all switches are in the O.. or
down position.
Page F-2
Warning: This test activates all the heating elements on the
print head and therefore should be used for testing purposes
only with full width labels to avoid damaging the print head.
SATO M-5900RV Operator and Technical Reference Manual
.ACTORY MODE
COUNTER cLEAR
NON
.ACTORY TEST
PRINT
TO:
See PAGE 7-1
For Example
PN 9001081
Rev. C

Advertisement

Table of Contents
loading

Table of Contents