Mitsubishi Electric PUHY-P200 Service Handbook page 108

Hide thumbs Also See for PUHY-P200:
Table of Contents

Advertisement

[ VII Control ]
(2) P500, P550, P600, P650, P700, P750, P800, P850, P900 EP400, EP450, EP500, EP550, EP600 models
The compressor on the OC starts up.
F
The total operating load of the indoor unit
after 5 minutes of operation is P250 or above.
The compressor on the OC remains in operation, and the
compressor on the OS starts up.
50
F
Completed in the integrated operation time of 35 minutes.
or
F < 50Hz (both OC and OS)
Completed in the integrated operation time of 90 minutes.
*1
Qj:Total capacity (model name) code
Refer to VII [1] 2.(1) Dipswitches for the capacity codes (page 89).
HWE10040
Initial startup mode starts.
60Hz
(*1 Qj
50)
Yes
60Hz (both OC and OS)
Initial startup mode complete
No
The compressor on the OC starts up.
*2
50
F
60Hz (OC)
Completed in the integrated operation time of 35 minutes.
or
F < 50Hz (OC)
Completed in the integrated operation time of 90 minutes.
*3
Both the OC and OS stop.
The startup sequence of the OC and OS is rotated.
The compressor on the OS starts up.
50
F
60Hz (OS)
Completed in the integrated operation time of 35 minutes.
or
F < 50Hz (OS)
Completed in the integrated operation time of 90 minutes.
*2
The air conditioning load is too small
for both the OC and the OS to
simultaneously stay in operation.
*3
The air conditioning load is
high enough for both OC and OS to
simultaneously stay in operation.
- 99 -
GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents