This chapter introduces the installation and commissioning of the SmartCabinet. Ensure that all the installation tools
and fittings are at hand before installation, and perform operation according to the content in this chapter.
The flow chart of installation is shown in Figure 3-1.

3.1 Installing The Cabinet

1. Place the cabinet on the prearranged position, and use a movable wrench to loosen the fixing nuts on the four feet
bolts on the cabinet, as shown in Figure 3-2.
2. Rotate the hexagon head bolt on the bottom of the feet clockwise or counter clockwise till the feet rise or drop to an
optimal position, and use a gradienter to ensure that the cabinet is horizontal.
3. Tighten the fixing nuts (shown in Figure 3-2) on the feet bolts counter clockwise, and the cabinet adjustment is
completed.

3.2 Installing AC Components

The AC components comprise AC indoor unit, and AC outdoor unit. When delivery, the AC indoor unit has been
installed in the cabinet before delivery, the AC outdoor unit is placed inside the cabinet and delivered with the cabinet.
In field, you need to place the AC outdoor unit reasonably, connect copper pipes between the AC indoor unit and
outdoor unit, vacuum and connect cables.

Chapter 3 Installation

Installing the
cabinet
Installing
SmartCabinet
monitoring
system
Connecting
cables
Figure 3-1 Flow chart of installation
Clockwise
Counter clockwise
Figure 3-2 Loosening the fixing nut
SmartCabinet Integrated Solution User Manual
Installing AC
components
Installing PDU
power distribution
system
Configuring
communication
address and port
The feet rise
Chapter 3 Installation
Installing UPS
power supply
system
Installing
fire-fighting
subrack
Cable
management
and installing
accessories
Fixing nut
Hexagon bolt
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents