(5) Trigger
Attach the two test leads to the trigger and measure the resistance.
Trigger resistance
80-130 Ω
10.3 Trigger adjustment
Adjust the clearance between trigger and the projection of the rotor.
Trigger clearance
0.0197-0.0275 in (0.50-0.75 mm)
Insert a feeler gauge between the trigger and the projection of the rotor; loosen the trigger fixed plate bolt
to adjust the clearance slightly. Never move the plastic part of trigger,
46