FP optimail Installation Manual page 14

Hide thumbs Also See for optimail:
Table of Contents

Advertisement

14
optimail Installation Guide
Connection cable
Network cable
Power connection
(AC adapter)
Power cable
If you are using the Universal Link Box:
(optional)
• Set up the Universal Link Box (ULB)
according to the enclosed manual.
• Use the adapter (D-Sub, 9-pin male / 25-
pin male) to plug the connection cable to
the serial interface of optimail.
Adapter
• Plug the AC adapter of the ULB into a
grounded single-phase power socket.
Make sure your office power supply con-
forms to power requirements shown on the
AC adapter's serial number plate.
Power cable
• Connect the power cable to the postage
meter. The power connection is at the rear
of the optimail.
• Plug the power plug into a grounded
single-phase power socket.
Make sure your office power supply con-
forms to power requirements shown on the
serial number plate of the optimail.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the optimail and is the answer not in the manual?

Questions and answers

Table of Contents