Checks And Inspections; Checking The Pick Up; Checking The Recharge Coil - Derbi GP1 50 cc Workshop Manual

Table of Contents

Advertisement

C
C
HECKS AND INSPECTIONS
HECKS AND INSPECTIONS
Checks to be carried out in the event of ignition faults
and/or missed sparking.
Check the spark plug (clean with a metal brush. Remove all
incrustations. Blow with an air jet and replace if necessary).
Without removing the stator, perform the inspections given
below.
C
C
-
HECKING THE PICK
HECKING THE PICK UP
Specification
1 Red/white cable
After a visual inspection of the electrical connections, carry
out measurements on the recharge coil, on the pick-up (see
table), and continuity measurements using the special tes-
ter.
If faults are identified through the above inspections, proceed
by replacing the stator, otherwise replace the ECU. Bear in
mind that the ECU connections must only be detached when
the engine is not running.
Specific tooling
020331Y Digital multimeter

Checking the recharge coil

Specification
1 White/green cable
Comprobación continuidad
Specification
1 White cable-frame
2 White cable - engine
117
UP
Desc./Quantity
90±140ohm
Desc./Quantity
800±1100 ohm
Desc./Quantity
Continuity
Continuity

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents