Operation Verification; Signal Reception Verification - Wellav UMH160R User Manual

Professional hd integrated receiver decoder
Hide thumbs Also See for UMH160R:
Table of Contents

Advertisement

This interface will show a "Reset" button, once you click a prompt message will appear asking for
verification. Then the equipment will reboot automatically.
Before you reset the device you'd better save the configuration of the equipment.

3.5. Operation Verification

This section briefly describes some simple verification/debugging on the device after
configuring the parameters of the device.
3.5.1

Signal Reception Verification

Precondition:
a. For tuner input test: satellite signal is ready and strong.
b. For ASI input test: ASI signal source equipment can stream out ASI signal.
The configuration of IRD:
The items need to be checked are listed in the following table.
Items
Modify the signal reception
mode
(Front panel modification)
Modify the signal reception
mode
(Modification
WEB)
Signal Connection
PIC-3.4-42
Method
Inputs -> Source select menu
(Through the front panel to select from ASI or Tuner
which matches your current input signal).
Login WEB UI to select correct input source in
"Inputs->Source Select" configuration page.
through
(Refer to Figure 3.4 of this manual)
Make sure the signal is well connected to the right
interfaces:
1. Whether the RF signal is connected to the
tuner input.
2. Whether the ASI source is connected ASI
Input.
3. Whether the device has been connected to
management network through the device
"Management" port.
45

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Wellav UMH160R

Table of Contents