Installation; Kozy Heat #816-Cl Co-Linear Vent System - kozy heat CSK-29-G Installation And Operation Manual

Chaska 29-glass direct vent gas fireplace insert
Hide thumbs Also See for CSK-29-G:
Table of Contents

Advertisement

6.0 INSTALLATION

6.1 Kozy Heat #816-CL Co-
Linear Vent System
IMPORTANT: Proper operation of this insert requires the exhaust
and combustion air pipes to be connected to the correct collar,
on both the termination kit and the gas fireplace insert air duct.
The fireplace insert air duct exhaust collar is located on the
right side. Install termination cap with the exhaust collar on the
right side.
NOTE: The exhaust pipe will have a red marking.
IMPORTANT: Maximum horizontal vent runs of 24 in (609 mm)
require a 1 in (25mm) rise per 12 in (305 mm) run.
1.
Carefully extend the exhaust and combustion air intake pipes
to total chimney length required (see Section 3.2.2 on page
12).
Intake Collar (extends through bottom plate)
(A)
Exhaust Collar (extends through middle
(B)
divider plate)
Figure 6.1, #816-CL Termination Cap
(Your component may look different than the one shown)
#816-CL CO-LINEAR VENT SYSTEM
E
A
C
D
2.
Slide the combustion air intake pipe (the end without a collar)
over termination cap collar (A). Secure to termination cap (E)
with provided (3) self-tapping screws (D).
3.
Place a bead of sealant around the inner edge at the end of
the exhaust pipe (without collar / red marking) and slide onto
the corresponding labeled collar (B) on termination cap (E).
4.
Secure the exhaust pipe to termination cap (E) with the
provided (3) self-tapping screws. Apply additional sealant
around joint to ensure a proper seal.
5.
Complete vent system installation by following the
instructions outlined in Sections 6.2 through 6.5.
Sealant
(C)
Self-Tapping Screws - (3) total (2 shown)
(D)
Termination Cap
(E)
B
C
INSTALLATION 15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chaska 29-log csk-29-lChaska 29-glass

Table of Contents