Checking The Roller Tensioners (Every 3-6 Months) - Roundup VCT-2000 Owner's Manual

Vertical contact toaster
Hide thumbs Also See for VCT-2000:
Table of Contents

Advertisement

VERTICAL CONTACT TOASTER
Checking the Roller Tensioners
(every 3–6 months)
MEASURING THE ROLLER TENSIONERS
1. Measure the Roller Tensioner on both inner
Conveyor Covers (Figure 10) using a U.S Nickel.
2. The space between the inner Conveyor Cover
and bottom of the Tensioner wheel should be
13/16" (2.1 cm) or the height of a U.S. Nickel.
3. Adjust or replace any damaged ones as
recommended.
REPLACING THE ROLLER TENSIONERS
1. Remove the acorn nuts and old Roller Tensioner
Assembly (Figure 11).
2. Replace Tensioner Assembly, and reassemble.
3. Make sure the spacers are placed inside the
Tensioner arm. The spacers are smaller than the
holes to allow the Tensioner to pivot freely.
MAINTENANCE (continued)
14
Figure 10. Measuring the Roller Tensioner
Weld
Acorn Nuts
Screws
Tensioner
Assy.
Figure 11. Replacing Roller Tensioner Assy.
Spacers
Tape
P/N 1010775 Rev. J 10/13
Burger King

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents