Checking The Roller Tensioners - Roundup VCT-2000 Owner's Manual

Vertical contact toaster
Hide thumbs Also See for VCT-2000:
Table of Contents

Advertisement

Vertical contact toaster

Checking the roller tensioners

(every 3–6 months)
measUrInG the rOller tensIOners
1. Measure the Roller tensioner on both inner
Conveyor Covers (figure 14) using a u.S Nickel.
2. the space between the inner Conveyor Cover
and bottom of the tensioner wheel should be
13/16" (2.1 cm) or the height of a u.S. Nickel.
3. adjust or replace any damaged ones as
recommended.
replaCInG the rOller tensIOners
1. Remove the acorn nuts and old Roller tensioner
assembly (figure 15).
2. Replace tensioner assembly, and reassemble.
3. Make sure the spacers are placed inside the
tensioner arm. the spacers are smaller than the
holes to allow the tensioner to pivot freely.
replaCInG the sprInG tensIOner
1. Remove the acorn nuts (figure 16).
2. Remove the old Spring tensioner assembly
(figure 16).
3. Replace tensioner assembly and reassemble
unit.
maIntenanCe (continued)
14
figure 14. measuring roller tensioner
weld
acorn nuts
screws
tensioner
assy.
figure 15. replacing the roller tensioner
acorn nuts
teflon tape
figure 16. replacing spring tensioner
spacers
teflon tape
weld
screws
spring
tensioner
assy.
P/N 1010794 Rev. C 06/08
Sonic

Advertisement

Table of Contents
loading

Table of Contents