Roller Tensioners (Every 3 To 6 Months) - Roundup VCT-2000 Owner's Manual

Vertical contact toaster
Hide thumbs Also See for VCT-2000:
Table of Contents

Advertisement

Roller Tensioners (Every 3 to 6 months)

MEASURING ROLLER TENSIONERS
1. Measure the Roller Tensioner on both inner
Conveyor Covers (Figure 13). The space between
the inner Conveyor Cover and bottom of the ten-
sioner wheel should be 13/16" (2.1 cm) or the
height of a U.S. Nickel. Adjust or replace any
damaged ones as recommended.
Figure 13. Measuring Roller Tensioner Assy.
P/N 1010875 Rev. D 10/15
MAINTENANCE (continued)
REPLACING ROLLER TENSIONERS
15
VERTICAL CONTACT TOASTER
1. Remove the Acorn Nuts and old Roller Tensioner
Assembly (Figure 14).
2. Replace with the new Roller Tensioner Assembly,
and reassemble.
3. Make sure the spacers are placed inside the
tensioner arm. The spacers are smaller than the
holes to allow the tensioner to pivot freely.
Acorn Nuts
Tensioner
Assy.
Figure 14. Replacing Roller Tensioner Assy.
Weld
Screws
Spacers
Tape

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents