Checking The Conveyor Belt Chains (Every 3-6 Months) - Roundup VCT-2000 Owner's Manual

Vertical contact toaster
Hide thumbs Also See for VCT-2000:
Table of Contents

Advertisement

Checking the Conveyor Belt Chains
(Every 3–6 Months)
MEASURING CONVEYOR BELT CHAINS
1. Turn the unit off, unplug the power cord, and
allow the unit to cool.
2. Remove the Bun Feeder and Heat Shield (Figure
1) and set the Bun Thickness Compression
Knobs to 6 & F.
3. Open both Conveyor Covers and pull the Belt
Wrap Pin out of the zipper (Figure 6).
4. Remove the Belt Wrap.
5. Facing the toaster, locate the approximate center-
point of the Conveyor Chain.
6. Pull the Conveyor Chain away from the edge of
the toaster (Figure 8).
7. Stand a U.S. Dime on end between the frame
and the chain (Figure 8).
8. If the gap is significantly wider than the coin,
REMOVE links as described below.
9. Disconnect the Conveyor Belt Chain by squeez-
ing any two links together and unhooking both
ends one link (Figure 9). Needle-nose pliers may
be used.
NOTE: There are two small 1/2" links on each side
of the Conveyor Belt Chain. The rest are large 3/4"
links.
10. Remove one 1/2" link from the belt.
11. Reassemble the Conveyor Belt Chain onto the
sprockets as described in Replacing Conveyor
Belt Chains.
12. Measure the gap again to ensure it is not too
tight.
13. Check the opposite side of the toaster using the
same steps.
NOTE: If the Conveyor Belt Chain is too tight to be
reassembled, remove an additional small 1/2" link
and install a large 3/4" link in its place. This will
shorten the Conveyor Belt Chain by 1/4" overall.
P/N 1010775 Rev. J 10/13
Burger King
MAINTENANCE (continued)
Large Link
P/N 0800121
Small Link
P/N 0800204
REPLACING CONVEYOR BELT CHAINS
NOTE: The ends of the hooks must point down
(Figure 9).
NOTE: Make sure the Conveyor Belt Chain is
installed under the Upper Support Rod and over
the Lower Support Rod.
13
VERTICAL CONTACT TOASTER
Figure 8. Measuring Conveyor Belt Chain
Upper Support Rod
Figure 9. Removing Conveyor Belt
1. Turn the power off, unplug the power cord, and
allow the unit to cool before proceeding.
2. Remove the Bun Feeder and Heat Shield and set
the Compression Control Knobs to 6 & F.
3. Open both Conveyor Covers and pull the Belt
Wrap Pin out of the zipper.
4. Remove and discard the old Belt Wrap(s).
5. Disconnect the Conveyor Belt Chain by squeez-
ing any two links together and unhooking both
ends of one link (Figure 9).
5. Place the replacement Conveyor Belt Chain on
the top sprockets with hook ends down.
6. Wrap the Conveyor Belt Chain around the top
and lower sprockets and connect by hooking both
ends together.
Rotation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents