Maintenance; Cleaning Black Release Sheet Conveyor Belts & Toaster - Roundup VCT-20 Deluxe Owner's Manual

Vertical contact toaset
Hide thumbs Also See for VCT-20 Deluxe:
Table of Contents

Advertisement

VERTICAL CONTACT TOASTER
When this occurs, the temperature display will flash
"CHEC" (Figure 10). To restart the unit, ambient
temperature must drop to 140°F (60°C) and the
unit must be turned off, then back on.
If incoming power drops below 190 Volts, the
toaster will shut down and the display will read
"PO" (Figure 11). To reset, power supply must be
over 190 Volts, then the unit must be turned off and
back on.
WARNING
Turn the unit off, disconnect the power source
and allow the unit to cool down before performing
any service or maintenance on the unit.
CAUTION
To prevent damage to the unit, do not use abra-
sive cleaners on the release sheet or belt wrap.
CAUTION
Failure to use release sheets may result in dam-
age to the unit and loss of warranty coverage.
Daily
CLEANING THE BLACK RELEASE SHEET, CONVEYOR
BELT WRAPS AND TOASTER
Tools Required:
Heat resistant gloves
Clean, sanitized towels
Scrub brush with Sanitizer Solution
1. Turn rocker switch (power on/off) to OFF, and
allow the unit to cool sufficiently to handle.
2. Put on protective gloves. Remove heat shield,
bun chute. (Figure 12).
3. Remove the release sheet. Wipe both sides of
the release sheet with a clean towel and a warm
sanitizer solution and allow to air dry.
4. Turn rocker switch (power on/off) to ON.
5. Depress and hold the activation button with one
hand. Use your other hand, hold the scrub brush
after dipping in sanitizer solution (Figure 12).
"PO" will flash when
incoming power drops below
190 Volts. Toaster shuts
down.

MAINTENANCE

6. Use a back and forth motion covering the belt
surface for 20 seconds per side (two rotations of
the belt flap). Repeat on second belt (Figure 12)
7. Turn rocker switch (power on/off) to OFF and un-
plug the power cord.
8. Wipe down the outside of the toaster with a
clean, damp, sanitized towel and allow to air dry.
9. Install the release sheet by draping it over both
sides of the platen with the crease centered
directly on the platen.
10. Install bun chute so hooks are installed over the
lower rear yellow support rod. Install the heat
shield alligning clips over platen (Figure 3).
Cleaning Brush used in
a SIDE to SIDE motion
Conveyor
Cover Assy.
Bun Chute
9200580 (ONLY)
10
TEMP
UP
POWER
Figure 11. "PO" Fault Message
Figure 12. Components
P/N 1010747 Rev C 06/02
A.J. Antunes & Co.
PO
˚F
˚C
TEMP
TEMP
DOWN
SCALE
Heat Shield
Release
Sheet
Conveyor
Cover Assy.
Interlock Switch
Power Cord
9200580 (ONLY)

Advertisement

Table of Contents
loading

Table of Contents