CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
1. Remove seal cap by lifting up and off of the starting
collar.
2. Place 12 in. (305 mm) vent section on the starting collar.
WARNING! Risk of Fire!
cal pipe is required prior to attaching any elbow to the appliance.
3. Place fi berglass rope ring over initial twelve inch vent
section and position tightly to top of appliance.
4. Remove bottom metal panel by removing four screws.
Screw locations are shown in Figure 9.1. The two
screws on the bottom side are located behind the panel.
Remove all four screws and gently lift the panel off the
appliance avoiding contact with the non-combustible
board if possible.
34
A MINIMUM of twelve inches verti-
Heat & Glo • RED40-N-AU, RED40ST-N-AU • 2294-900 Rev. G • 7/14
BOTTOM PANEL SCREW LOCATIONS
Figure 9.1 Location of Fiberglass Rope Ring
FIBERGLASS ROPE RING