Ac Input/Output Connection - MPP Solar PIP-HS User Manual

1-5kva inverter/charger
Hide thumbs Also See for PIP-HS:
Table of Contents

Advertisement

AC Input/Output Connection

CAUTION!! Before connecting to AC input power source, please install a separate AC breaker between
inverter and AC input power source. This will ensure the inverter can be securely disconnected during
maintenance and fully protected from over current of AC input. The recommended spec of AC breaker is 10A
for 1KVA, 20A for 2KVA, 32A for 3KVA , 40A for 4KVA and 50A for 5KVA.
CAUTION!! There are two terminal blocks with "IN" and "OUT" markings. Please do NOT mis-connect input
and output connectors.
WARNING! All wiring must be performed by a qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC input
connection. To reduce risk of injury, please use the proper recommended cable size as below.
Suggested cable requirement for AC wires
Model
1KVA
2KVA
3KVA
4KVA
5KVA
Please follow below steps to implement AC input/output connection:
1. Before making AC input/output connection, be sure to open DC protector or disconnector first.
2. Remove insulation sleeve 10mm for six conductors. And shorten phase L and neutral conductor N 3 mm.
3. Insert AC input wires according to polarities indicated on terminal block and tighten the terminal screws. Be
sure to connect PE protective conductor (
→Ground (yellow-green)
L→LINE (brown or black)
N→Neutral (blue)
Gauge
Torque Value
16 AWG
14 AWG
12 AWG
10 AWG
8 AWG
) first.
7
0.5~ 0.6 Nm
0.8~ 1.0 Nm
1.2~ 1.6 Nm
1.4~1.6Nm
1.4~1.6Nm
1KVA
2KVA~ 5KVA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents