Chapter 5. Block Up Converter - Comtech EF Data LCS-4 Installation And Operation Manual

L-band combiner switch
Table of Contents

Advertisement

LCS-4 L-Band Combiner Switch
Block Up Converter
5.2.1 A
SSEMBLE
FP/WG0034
FP/WG0043
FP/WG0051
GA/GSKTCP137FULL
HW/10-32X5/8SHC
HW/10-FLT
HW/10-SPLIT
SW-WGS+48V-137SB
*Customer-Furnished
1. Place gasket (GA/GSKTCP137FUL) on waveguide Port 1 of Switch
(SW-WSC+48V-137SB).
2. Assemble one waveguide (FP/WG10359-1) and secure with six screws, flat washers,
and split washers to Port 1 of Switch.
3. Place gasket on waveguide Port 3 of switch.
4. Assemble second waveguide to Port 3 of Switch and secure using six screws, flat
washers, and split washers.
5. Install termination (FPWG00354) and gasket to Port 4 of switch and secure using six
screws, flat washers, and split washers.
IMPORTANT
W
S
AVEGUIDE
WITCH
Part No.
Termination, Small Fins
Waveguide, CPRG137
Waveguide, CPRG137
Gasket, CP137 Full
Screw, Socket Head Cap
Washer, Flt
Washer, Spit
Switch, Waveguide (CPR130)
LNB
Port 2 of the Switch is reserved for customer-furnished equipment.
Cover Port 2 until used.
K
, AS/9528-1
IT
Nomenclature
5–2
Revision 1
MN/LCS4.IOM
QTY
1
1
1
4
32
32
32
1
2

Advertisement

Table of Contents
loading

Table of Contents