Figure 4-2. Switch Port Locations - Comtech EF Data LCS-4 Installation And Operation Manual

L-band combiner switch
Table of Contents

Advertisement

LCS-4 L-Band Combiner Switch
Low Noise Block Assembly
1. Remove all protective tape from switch and keep it clean.
2. Position LNBs and gaskets (GA/GSKTCP229FULL)
on Port 2 and Port 4 of switch.
3. Secure each LNB with eight bolts, flat washers, and
split washers.
4. Position adapter (28P1084) and gasket on Port 3 and
secure with bolts, flat washers, and split washers.
5. Place termination (CN/CX50NMALE) on threaded
port of adapter.

Figure 4-2. Switch Port locations

4–4
Revision 1
MN/LCS4.IOM

Advertisement

Table of Contents
loading

Table of Contents