Flow Regulator Assembly/Switch Assembly Removal & Installation - Kohler Electric Shower Installation And User Manual

Electric shower
Table of Contents

Advertisement

Flow Regulator Assembly/Switch Assembly- Removal and
Installation
WARNING! Isolate the electrical and water supplies before removing the cover. Mains
electricity connections are exposed when the cover is removed.
1.
Remove the three cover retaining screws, the cover and the service tunnel.
2.
Remove the hose from the outlet connector and loosen the connection to the
inlet connector.
3.
Remove the six screws that hold the switch assembly, heater tank, flow regulator
assembly and inlet connector.
Shower
Service Tunnel
4.
Remove all wiring from the spade connections on the switch assembly.
Note! Using long nose pliers, gently squeeze the lever lock and pull the
spade connection off the switch assembly.
Switch Assembly
Screw
33
Screws
Cover
Spade Connection
Lever Lock

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mira zest 7.5Mira zest 8.5

Table of Contents