Download Print this page
Kohler SKYLINE Series Installation Instructions Manual
Kohler SKYLINE Series Installation Instructions Manual

Kohler SKYLINE Series Installation Instructions Manual

Sliding, screen, 1d2p, 8/10mm

Advertisement

Quick Links

BEFORE YOU BEGIN
BEFORE YOU BEGIN
·
Before you install your shower door, please read
these instructions carefully to familiarize yourself
with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
·
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
These instructions contain important care, cleaning,
and warranty information-
instructions for the consumer.
·
Make sure that the bath and the finished wall
material are completely and correctly installed prior
to installing your shower door. Prepare waterproof
layer to wall and floor of the showering area. It is not
allowed for any presence of electric switches and
sockets. Make sure the floor drain runs smoothly.
·
Before starting the door installation, lay out and
identify all the parts. Use the exploded view
illustrated on page 3 for reference.
·
For the installation method of customized shower
with different dimensions, please refer to this
instructions.
· The product complies with QB 2584-2007.
CAUTION: Risk of injury or product damage.
Tempered glass cannot be cut, drilled or
knocked by hard object. Make sure corner area
of the glass refraining from knocking so as to
cause personal injury due to broken glass.
ATTENTION:
Please install this door on Kohler
receptors or curbs(Not included). If the curb is not
Kohler-branded, please note its top width should be
more than 80mm.
IMPORTANT:
The shower door requires a flat vertical
finished wall. The squareness of the wall is
recommended no more than 3 mm/m. KOHLER
Company won't take responsibility of the installation
quality.
ZHONGSHAN KOHLER SHOWER CO., LTD.
DEVELOPMENT ZONE, ZHONGSHAN, GUANGDONG, CHINA
1278976-T01-A
please leave these
·
·
·
·
·
·
·
QB 2584-2007
)
3mm/m
NO13-1, XINYE ROAD, ZHONGSHAN TORCH
13-1
©
Copyright Kohler China Investment Co., Ltd. 2016
-1-
©
SKYLINE
INSTALLATION INSTRUCTIONS
SLIDING, SCREEN, 1D2P, 8mm
K-705877T-FM-SHP
SLIDING, SCREEN, 1D2P, 10mm
K-81513T-FM-SHP
3
80mm
POST CODE: 528437
528437
8mm
10mm
(
2016

Advertisement

loading

Summary of Contents for Kohler SKYLINE Series

  • Page 1 · · All information is based on the latest product information available at the time of publication. Kohler China Ltd. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. · ·...
  • Page 2: Parts Identification

    ROUGHING-IN Unit: mm K-81513T 1400-2050 1850-2000 K-705877T PARTS IDENTIFICATION PARTS IDENTIFICATION IMPORTANT Before installation check that all components are correctly supplied. If any parts are missing please ring the helpline. 800-820-2628 800-820-2628 1278976-T01-A...
  • Page 3 Top Rail, 1D2P Top Cover-B, Skyline Sliding Skyline Sliding 1D2P No-Rebounce Assy, Top Cover-A, Skyline Sliding Skyline Sliding Screw Cap, Bar Twist Lock Jamb Moulding, Assy, Top Roller Assy, Skyline Sliding Skyline Sliding No-Rebounce Assy, Skyline Sliding Wall, Skyline Sliding Door Glass, Skyline Sliding Wall Jamb, Skyline Sliding...
  • Page 4: Installation Requirements

    INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS Tools Required · · Phillips Screwdriver · · Pencil · · Caulk Gun · · Measuring Tape · · Safety Glasses · Center Punch · · Hammer · · Knife · · Masonry Drill & 6mm Drilll Bit ·...
  • Page 5 Fix wall jambs. One is fixed on the wall. The other is not fixed on the wall after the holes are drilled. The wall jamb must be kept vertical. The wall jamb must be kept vertical. STEP Fix the top and bottom frames on the wall jamb. Note: There is only holes on the top frame.
  • Page 6 Insert the unfixed wall jamb into the frame. Then insert the whole wall jamb and fix the unfixed wall jamb. Insert the unfixed wall jamb. The wall jamb must be kept vertical. STEP Adjust the top and bottom frames vertical. The length shall be the same on two sides. Then rotate the lock to fix wall jamb.
  • Page 7 Insert fixed glass into top and bottom rails and then into wall jambs. Install anti-bounce assembly. IMPORTANT: Tray MUST be level along front edge. Use U-shaped protective seals on top and bottom of the fixed glass. STEP Insert side seal into the inside of the fix glass. Install blocks on top and bottom frames to make the fixed glass firm. Insert side seal.
  • Page 8 Install and adjust door glass. Install top roller. Install bottom roller. STEP Install seals and handle. Note: Cut the seals to proper length to prevent scrunching the wall jamb and glass. STEP 1278976-T01-A...
  • Page 9 Install cover extrusion and top cover. Apply silicone sealant to bottom of the fixed glass and both sides of the bottom threshold. STEP STEP Do not use the enclosure for at least 24 hours. 24hrs STEP 1278976-T01-A...

This manual is also suitable for:

Skyline k-81513t-fm-shpSkyline k-705877t-fm-shp