Install The Bidet; Complete The Installation - Kohler K-4858 Installation Manual

Bidet
Table of Contents

Advertisement

Available languages

Available languages

2. Install the Bidet

Install the bidet faucet and drain according to the manufacturer's instructions.
Refer to the roughing-in dimensions to determine the mounting hole locations, and
mark the floor accordingly.
Drill two 3/16" holes at the marked mounting hole locations.
Thread the floor bolts (included) into the mounting holes.
Apply a bead of sealant around the base of the bidet.
Position the bidet in the mounting location so both floor bolts extend through the
bidet mounting holes.
CAUTION: Risk of personal injury or product damage. Vitreous china can
break or chip if the nuts are overtightened or the product is handled carelessly.
Assemble the washers and nuts. Hand-tighten the nuts, then tighten an additional
1/2-turn with a wrench.
Position the cover on the bidet so the threaded posts extend through the bidet holes.
Securely hand tighten the plastic nuts.

Complete the Installation

Connect the water supplies and drain.
Turn on the hot and cold shut-off valves. Check the entire installation for leaks.
Repair as required.
Check all the connections for leaks for several days.
1020409–2–A
4
Kohler Co.

Advertisement

Table of Contents
loading

Table of Contents