Set-Up And Installation; Yoke Assembly - Elation Design LED 60 Strip WA Manual

Hide thumbs Also See for Design LED 60 Strip WA:
Table of Contents

Advertisement

6. SET-UP AND INSTALLATION

Yoke Assembly – Single Unit Operation (DLED 12 Brick shown for illustration purposes
only). The device can be placed directly on the stage floor or rigged in any orientation on a
truss without altering its operation characteristics. When connecting the hanging yoke to the
fixture, refer to the illustration below.
Cautions:
For added protection mount the fixtures in areas outside walking paths, seating areas, and
away from areas were the fixture might be reached by unauthorized personal.
Before mounting the fixture to any surface, make sure that the installation area can hold a
minimum point load of 10 times the device's weight.
Fixture installation must always be secured with a secondary safety attachment, such as an
appropriate safety cable.
To avoid injury, never stand directly below the device when mounting, removing, or
servicing the fixture.
Refer to regulations BGV C1 (formerly VBG 70) and DIN VDE0711-217
for proper installation in Europe To ensure proper installation, only
qualified staff should attempt installation.
©Elation Professional, Los Angeles Ca.
10
www.ElationLighting.com
Design LED 60 Strip WA™

Advertisement

Table of Contents
loading

Table of Contents