1. Edit schedule group
Create/Edit the schedule group through group edit.
2. Edit schedule pattern
You can create/edit the weekly/daily schedule through schedule pattern wizard.
3. Set schedule through schedule wizard
Apply the schedule pattern and operating period to the schedule group through schedule wizard.
4. Run/Stop schedule
Create/Edit the schedule group through group edit.
This section describes how to operate the AC SMART II function by using the schedule.
Manage schedule group
Schedule group is a gathering of devices to perform same movement. If pressing [Group edit] button,
'Group edit' screen which can create, revise, and remove schedule group is presented.
Name of currently selected group
and list of units included in the
applicable group are displayed.
List of currently
registered
schedule groups
is displayed.
You can create,
rename or delete
the schedule
group.
You can add/remove
the unit from specific
group.
Save the setting.
Create a schedule group with same
configuration as the set group from
unit management menu.
Cancel to save the
setting and return to
the previous screen.
Installation/Owner's Manual
5. Schedule menu
List of units not
included in the group
is displayed.
5-2
Need help?
Do you have a question about the V-NET AC Smart II Advanced Control Smart and is the answer not in the manual?
Questions and answers