Regulator Assembly; Figure 4. Beaters And Scraper Blades Installation - Cornelius FCB OVERCOUNTER POST-MIX DISPENSER Service Manual

Fcb overcounter post-mix dispenser with v3+features
Hide thumbs Also See for FCB OVERCOUNTER POST-MIX DISPENSER:
Table of Contents

Advertisement

BEATER
KEY ON END
OF POST

FIGURE 4. BEATERS AND SCRAPER BLADES INSTALLATION

WARNING: CO
CO
(carbon dioxide) gas leaks in the entire CO
2
suspected, particularly in a small area, immediately ventilate the contaminated area before
attempting to repair the leak. Personnel exposed to high concentration of CO
tremors which are followed rapidly by loss of consciousness and suffocation.
1. Unscrew protector cap (with chain attached) from CO
terclockwise to blow any dirt or dust from outlet fitting before installing primary CO
valve.
2. Remove shipping plug from primary CO
inside nut. Install regulator assembly on CO
DO NOT OPEN CO
CONNECTING SOFT DRINK TANKS CO
ASSEMBLY
(see Figure 2)
1. Connect soft drink tanks CO
2. Install gas quick disconnects on ends of soft drink tanks CO
TANKS AT THIS TIME.
displaces oxygen. Strict attention must be observed in the prevention of
2
regulator assembly coupling nut and make sure gasket is in place
2
2
CYLINDER VALVE AT THIS TIME.
2
lines to primary CO
2
KEY ON END
OF POST
SCRAPER BLADES MUST BE MOUNTED TO THE
BEATER BODY AS SHOWN USING THE PERFORATED
EDGE AS THE LEADING EDGE. LINE UP KEY ON END
OF POSTS WITH KEY SLOT IN SCRAPER BLADES.
and soft drink system. If a CO
2
cylinder valve. Open CO
2
cylinder so gages can be easily read, then tighten coupling nut.
LINES TO PRIMARY CO
2
regulator manifold assembly as shown in Figure 2.
2
lines. DO NOT CONNECT CO
2
11
KEY SLOT
ON BLADE
gas leak is
2
gas will experience
2
cylinder valve slightly coun-
2
regulator, then close
2
REGULATOR
2
LINES TO
2
2992

Advertisement

Table of Contents
loading

Table of Contents