Fuse Check List - Powertronix Quasar Service Manual

3x3 ups system
Table of Contents

Advertisement

Chapter 7 - Troubleshooting

Fuse Check List

7.7 -
Fuse Check List
Prior to any fault diagnosis, a serviceability check of the fuses is recommended. Failure of a fuse
can give an indication of a defective power device or component.
Table 7-3
Fuses
Fuse
F1
F2
F3
F4
F1
F4
F2
F3
F1
F2
F1
F2
F3
F4
F5
F1
7 - 12
1.
Using the list shown in Table 7 3 check each fuse for serviceability.
2.
Determine the serviceability of any related component or PCB and repair or replace as
required.
3.
Replace the fuse with a serviceable item.
4.
Continue with any required fault diagnosis.
Value
32A
Battery Bank 1
32A
Battery Bank 2
32A
Battery Bank 3
32A
Battery Bank 4
125A
Primary DC bus +ve
125A
Primary DC bus ve
125A
Secondary DC bus +ve
125A
Secondary DC bus ve
1A
DC+ Input
1A
DC Input
Input Phase R
10A
Input Phase S
10A
Input Phase T
10A
Battery +
10A
Battery
10A
1A
Cooling Fan Protection
Function
Battery Fuses Front Switch Panel
Batte
F e F o t S itch Pa el
Upper Power Section See Figure 7 5
U
P
Upper Power Section See Figure 7 5
U
P
Auxiliary DC DC Converter PCB
A ilia
Battery Charger PCB
y
Fan PCB
Service Manual
Location
S
ti
S
Fi
7 5
S
ti
S
Fi
7 5
DC DC Co e te PCB
g
3x3 UPS Troubleshooting
Issue 2 - November 2001

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Quasar and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

10kva15kva20kva30kva

Table of Contents