Service Manual
3.3.3 - Auxiliary DC-DC PSU Converter PCB CS0070 Settings
No link setting are required.
3.3.4 - Battery Charger PCB CS0074 Setting
Set the correct battery current limit according to the following link chart.
Link/Ampere
JP1
JP2
We recommed to used the following battery current limint setting:
Battery size
Battery current
Link
JP3
JP4
Battery test settings
Links JP5 to JP10 set the capacity of the standard battery, check the battery Ah to set the cor
rect value as shown in the table below
Link
Ah
JP11 SHOULD BE ALWAYS CLOSED
Set the automatic battery test interval referring to the table below (it is recommanded to use
48h)
Link
Time
3.3.5 - LCD Display Monitor Board CS0077 Settings
Used for PCB testing porposes only.
Link
JP1
JP3
Note: THE SILKSCREEN IDENT (JP1/JPS) IS NEXT TO PIN NUMBER 3.
LINK JP2 ( External EPO ):
JP2 is used to enable the operation of the optional external EPO.
Link
JP2
3x3 UPS Commissioning
Issue 2 - November 2001
1Amp
Open
Open
7.5 Ah
2x7.5Ah
1Amp
1Amp
Position
Function
Open
Boost recharge disable
Closed
Boost recharge enable
Open
Battery charger temperature compensation disable
Closed
Battery charger temperature compensation enable
JP10
JP9
7.2Ah
2x7.2Ah
J4
12Hours
Position
1–2
2–3
Ext EPO fitted
Open
3Amps
Open
Closed
3x7.5Ah
3Amps
JP8
JP7
3x7.2Ah
4x7.2Ah
J5
24Hours
Funktion
close for normal operation.
close for normal operation.
Ext EPO not fitted
Close
Chapter 3 - Commissioning
Validating the Installation
5Amps
Closed
Open
4x7.5Ah
3Amps
JP6
JP5
38Ah
65Ah
J6
48Hours
3 - 3
Need help?
Do you have a question about the Quasar and is the answer not in the manual?
Questions and answers