GE Digital Energy SitePro 400 VAC CESeries 7 Operating Manual page 54

Uninterruptible power supply
Table of Contents

Advertisement

Example 2:
SEM STOP before SEM START.
SEM START 18:00, SEM STOP 06:00 for weekday d4 - Tuesday.
Means that on d4 - Tuesday the SEM mode is active between 00:00 and 06:00 and between 18:00 and
23:59.
Weekday
d1
- Saturday
SEM START
00:00
SEM STOP
23:59
Example 3:
SEM mode during the night and week-end.
If the SEM mode must be enabled all nights (d3 - Monday ÷ d7 - Friday) between 18:00 in the evening
and 06:00 of the following morning and during all Saturday (d1) and Sunday (d2), the corresponding
parameters are:
Weekday
d1
- Saturday
SEM START
00:00
SEM STOP
23:59
Example 4:
If the SEM mode must be enabled on Monday (d3) and Tuesday (d4) between 18:00 in the evening and
06:00 of the following morning, on Friday (d7) between 12:00 and 13:00, during all Saturday (d1) and on
Sunday (d2) until 20:00, the corresponding parameters are.
Weekday
d1
- Saturday
SEM START
00:00
SEM STOP
23:59
ECM START
ECM STOP
In dark colour are displayed the times with SEM mode operation.
The arrows indicate the conditions given by the SEM START and SEM STOP times introduced with the
parameters.
Note that on day d6 - Thursday the interval has length 0 (zero), therefore the SEM mode is not enabled
on this day.
Modifications reserved
OPM_SPE_XXX_60K_60K_7GB_V010.doc
d2
d3
- Sunday
- Monday
00:00
00:00
23:59
23:59
d2
d3
- Sunday
- Monday
00:00
18:00
23:59
06:00
d2
d3
- Sunday
- Monday
00:00
18:00
20:00
23:59
d4
d5
- Tuesday
- Wednesday
18:00
00:00
06:00
23:59
d4
d5
- Tuesday
- Wednesday
18:00
18:00
06:00
06:00
d4
d5
- Tuesday
- Wednesday
18:00
00:00
06:00
06:00
d6
d7
- Thursday
- Friday
00:00
00:00
23:59
23:59
d6
d7
- Thursday
- Friday
18:00
18:00
06:00
06:00
d6
d7
- Thursday
- Friday
00:00
12:00
00:00
13:00