The UPS cabinet is free standing and normally does not require bolting to the floor.
In any case the cabinet basement is suitable to be floor fixed, when requested by local standards.
In case of parallel system, try to place the UPS
modules in sequence of their numbers (marked
on the packing).
If the units are positioned "side by side", the side
panels must be mounted on all units.
Remove the side air inlet grids on the
intermediate units to run the control bus cable
connections.

4.4.2 Battery location

Batteries require a well-ventilated room with controlled temperature to obtain reliable operation.
The Battery can be install immediately adjacent to the UPS (left or right side) or remotely from the UPS.
If the Battery is installed remotely from the UPS, a wall mounted DC disconnect device must be installed
within line-of-site to both the UPS and the Battery.
The optimal room temperature for the Battery is 20°C (68°F) to 25°C (77°F).
The life of valve-regulated batteries will be reduced by 50% for each additional 10°C (18°F) that the
Battery ambient temperature is above 25°C (77°F).
The Battery System associated with larger UPS is usually either rack mounted or installed in multiple
Battery Cabinets.
Installation and assembly must be made according to the local standards and Battery System
manufacturer's recommendations.
The Battery Circuit Breaker or Battery Fuse Box must be mounted as near as possible to the Battery.
WARNING !
Battery installation and connection must be performed by QUALIFIED PERSONNEL
ONLY.
Read all safety instructions before proceeding with the installation (see Section 1).
Modifications reserved
OPM_SPE_XXX_60K_60K_7GB_V010.doc
Fig. 4.4.1-3 RPA system disposition
Pagina 23/90
Operatine Manual SitePro 60 kVA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitepro 60 kva series 7

Table of Contents