Note: Throughout this manual, text may appear either in
bolded. The
Raven web site. Refer to these sources for more information. The
bolded text are names of Cruizer II icons.
Arrows (
icons that must be selected to complete the procedure.

Initial Startup

The first time that the console is powered up, a Setup Wizard will step through
the initial setup and calibration. The Setup Wizard helps with the configuration
process and is only required the first time the Cruizer II is started. Any settings
selected or calibration values entered in the Setup Wizard may be adjusted at
any time via the
more information.
Note: If the touch screen does not properly power up, refer to the
Troubleshooting
1. On the first screen, select the language and either Metric (meters, km/h,
hectares etc.) or U.S. (inches, mph, acres etc.) for the units display.
2. Touch Next
Setup screen.
3. Use the displayed keypad to enter the overall implement, equipment or
boom width in the units selected on the previous screen.
4. Touch Next
Antenna Position screen.
Live Antenna
Position Display
Use the Antenna Position screen to set the position of the GPS antenna
with respect to the center of the boom or implement width.
The left side of the Antenna Position screen displays a visual reference of
the location of the boom or implement and DGPS antenna. After the
antenna offsets are programmed, the antenna position display should
show a general representation of the actual machine configuration.
To set the Antenna Position offsets, touch the desired offset value and use
the on-screen keypad to enter the new value.
4
blue
text are references to section headings or the
) within the following sections indicate a series of
Tools
Menu. See the
section on page 29.
to accept the selected settings and to advance to Width
to accept the displayed selection and to advance to the
Tools Menu
section on page 17 for
blue
or
Current
Offset Units
Current
Offset Values
Boom/Implement
Location Selection