Prior To Cutting/Drilling Holes - FLIR A3 F series User Manual

Hide thumbs Also See for A3 F series:
Table of Contents

Advertisement

9 – Installation (FLIR A3xx pt series)
T639345;a2
Figure 9.3 FLIR A3xx pt series camera mounting (mm)
NOTE: Connect and operate the camera as a bench test at ground level prior to mounting the camera in
its final location.
Use a thread locking compound such as Loctite 242 or equivalent with all metal to
metal threaded connections.
Using the template supplied with the camera as a guide, mark the location of the
holes for mounting the camera. If the template is printed, be sure it is printed to scale
so the dimensions are correct.
Once the holes are drilled in the mounting surface, install four (4) 5/16" or M8 bolts
through the base of the camera.
9.5

Prior to cutting/drilling holes

When selecting a mounting location for the FLIR A3xx pt series camera, consider
cable lengths and cable routing. Ensure the cables are long enough given the pro-
posed mounting locations and cable routing requirements.
Use cables that have sufficient dimensions to ensure safety (for power cables) and
adequate signal strength (for video and communications).
23
Publ. No. T559743 Rev. a601 – ENGLISH (EN) – April 26, 2012

Advertisement

Table of Contents
loading

This manual is also suitable for:

A3 pt series

Table of Contents