Reorganize Your Current Equipment - HP proCurve User Manual

For procurve hubs & switches
Table of Contents

Advertisement

Figure 10-4. Summary Report
A priority of low, medium or high is given to help you determine the urgency
of each recommendation. The priorities are defined as follows:
Low: Implementing this recommendation will result in a small reduction
I
in network utilization. A low priority recommendation may be regarded
as advance warning of a marginal condition on the network. These condi-
tions often evolve into situations that produce medium or high priority
recommendations in future reports.
I
Medium: Implementing this recommendation will result in a measurable
reduction in network utilization.
I
High: Implementing this recommendation will result in a significant
reduction in overall network utilization.
The Summary page may also provide explanations when no recommendations
are made. Possible reasons for no recommendations are:
I
The network is already optimized.
An error condition occurred because of bad data.
I

Reorganize Your Current Equipment

The report titled Reorganize Your Current Equipment makes recommenda-
tions about which nodes you can move to another location in the network in
order to reduce the amount of traffic forwarded through network devices such
as bridges, switches and routers.
Planning for Network Growth
Reorganize Your Current Equipment
10-9

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the proCurve and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Toptools

Table of Contents