Replacing The Interface/Lvs Module - PRG BAD Boy Field Service Manual

Spot luminaire
Hide thumbs Also See for BAD Boy:
Table of Contents

Advertisement

Replacing the Interface/LVS Module

Parts:
23.9812.0812
Tools and Supplies:
#2 Philips screwdriver
WARNING: Remove power from luminaire before performing any maintenance procedures.
To replace the Interface/LVS Module:
Step 1. Remove power from luminaire and allow components to cool for at least 5 minutes.
Step 2. Remove Intake Cover. (Refer to
Step 3. At Interface/LVS Module, remove four 10-32 x 3/8" PPB SEMS screws
Step 4. At left side of Interface/LVS Module, disconnect the following wiring:
a. Fan cable.
b. APS Control Line cable.
c. Neutral (white) cable.
d. Line (black) cable.
e. Ground cable.
Step 5. At right side of Interface/LVS Module, disconnect the following wiring:
a. Fan cable.
b. CAN Bus cable.
c. Power cables (red and black).
Step 6. Remove Interface/LVS Module from enclosure.
Note: The battery pack cable is intentionally NOT connected. Do not re-connect.
Step 7. Replace Interface/LVS Module by doing steps in reverse. Do not connect battery pack cable.
Leave this cable disconnected.
0 2. 9 8 1 2. 0 0 05
M
AINTENANCE
1 EA ASSY, INTERFACE/LVS MODULE
"Removing the Enclosure Covers"
: R
R
P
EMOVE AND
EPLACE
on page 29.)
3
ROCEDURES
(Figure
3-33).
69

Advertisement

Table of Contents
loading

Table of Contents