Download Print this page

Borg & Overstrom 628 Installation & Operation Manual page 65

Watercoolers

Advertisement

Fig 4.
Replace with new circuit board, as supplied.
Fig 5.
Remove screws holding condenser and very carefully
ease condenser away as shown below in Fig 6.
Fig 6.
Access now possible to Hot Tank.
If also replacing Hot Water Tank follow Hot Water Tank Replacement Procedure sections 7-15 at this stage.
(This may then mean some of the follwing stages of this procedure are already covered there).
628 & 698 Models
65

Advertisement

loading

This manual is also suitable for:

698