Vertical Stabilizer Installation - Seagull Models SEAGULL 40 Assembly Manual

Hand-made almost ready to fly r/c model aircraft
Hide thumbs Also See for SEAGULL 40:
Table of Contents

Advertisement

SEAGULL 40
LOW WING TRAINER.
7) When you are sure that everything is
aligned correctly, mix up a generous amount
of 30 Minute Epoxy. Apply a thin layer to the
top and bottom of the stabilizer mounting area
and to the stabilizer mounting platform sides
in the fuselage. Slide the stabilizer in place
and realign. Double check all of your mea-
surements once more before the epoxy cures.
Hold the stabilizer in place with T-pins or mask-
ing tape and remove any excess epoxy using
a paper towel and rubbing alcohol.
8)
After the epoxy has fully cured, re-
move the masking tape or T-pins used to hold
the stabilizer in place. Carefully inspect the
glue joints. Use more epoxy to fill in any gaps
that may exist that were not filled previously
and clean up the excess using a paper towel
and rubbing alcohol.

VERTICAL STABILIZER INSTALLATION.

Hinge.
1) Using a modeling knife, remove the
covering from over the precut hinge slot cut
into the lower rear portion of the fuselage. This
slot accepts the lower rudder hinge.
12
Hinge slot.
Instruction Manual.
2) Slide the vertical stabilizer into the slot
in the top of the fuselage. The rear edge of
the stabilizer should be flush with the rear edge
of the fuselage and the lower rudder hinge
should engage the precut hinge slot in the
lower fuselage. The bottom edge of the stabi-
lizer should also be firmly pushed against the
top of the horizontal stabilizer.
3) While holding the vertical stabilizer
firmly in place, use a pen and draw a line on
each side of the vertical stabilizer where it
meets the top of the fuselage.
Pen.
4) Remove the stabilizer. Using a mod-
eling knife, remove the covering from below
the lines you drew.
Remove covering.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents