www.seagullmodels.com
112mm.
NOSE GEAR INSTALLATION.
2.5mm.
3x25mm.
5) Bolt the engine to the engine mount using
the four machine screws. Double check that
all the screws are tight before proceeding.
6) Attach the Z-Bend in the pushrod wire to
the throttle arm on the carburetor.
Installing steering arm as below.
Steering arm.
Adjustable connector.
3x25mm.
Adjust the nose gear steering arm until the
arm is parallel with the fire wall.
Pushrod wire.
9