Handlebar Refitting; Front Fork Removal; Front Fork Overhaul - PIAGGIO NRG Power DT Workshop Manual

Nrg power dt 633257
Table of Contents

Advertisement

NRG Power DT
Refitting
When refitting, tighten to the prescribed torque and
apply the recommended grease to the threaded
cone.
Recommended products
AGIP GREASE PV2 Grease for control levers
on the engine
White anhydrous-calcium based grease to protect
roller bearings; temperature range between -20 °
C and +120 °C; NLGI 2; ISO-L-XBCIB2
Locking torques (N*m)
Locking torque: 65 to 70 N•m
Front fork
Removal
- Remove the front brake calliper.
- Remove the odometer cable from the reduction
gear box.
- Remove the front mudguard.
- Remove the handlebar.
After removing the steering ring-nut using the spe-
cial tool, lean the vehicle on one side and extract
the steering tube.
Specific tooling
020055Y Wrench for steering tube ring nut
See also
Front brake calliper
Handlebar
Overhaul
Replacing the seal ring
Suspensions
SUSP - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents