ENGLISH
SERVICE MANUAL
OTHER SYSTEMS
SCREW AND NUT TIGHTENING CHECK
1.
Drive the machine to the appointed disposal area, and empty the recovery water tank (21) with the hose (16).
2.
Place the machine on a hoisting system (if available).
Otherwise, drive the machine on a level floor.
3.
•.
(For.Adfinity
20 D, X 20 D, X 20 C, X 24 D) Turn the ignition key (80) to "0".
TM
17 ST, 20 ST) Turn off the switches (71) and (73).
•
(For.Adfinity
TM
4.
Grasp the handle (41) and carefully lift the tank (40).
5.
Check:
•
Tightening of mounting screws and nuts;
•
Correct position of fasteners;
•
Visible faults in the components;
•
Leaks of fluids.
6.
Carefully lower the tank (40).
7.
Remove the machine from the hoisting system.
54
9096982000(1)2007-02
Adfinity
17 ST, 20 ST, 20 D, X 20 D, X 20 C, X 24 D
TM