Hot Air Ducting Installation; Gravity Kit - Enerzone Solution 2.5ZC Installation Instructions Manual

Hide thumbs Also See for Solution 2.5ZC:
Table of Contents

Advertisement

2.5

HOT AIR DUCTING INSTALLATION

Different hot air ducting systems can be installed with the ENERZONE SOLUTION 2.5ZC:
 Gravity kit
 Forced air kit

2.5.1 Gravity Kit

The kit includes:
 2 x hot air outlets (grilles and frames);
o
 2 x 90
elbows with brackets;
 1 deflector.
The gravity kit allows you to block the upper fireplace louver. To do so, follow the steps
below:
a) Remove the upper louver from the fireplace;
b) Install the deflector as shown on figure 20;
c) Put the upper louver back into place.
The safety rules for hot air ducting gravity kit installations are the following:
Minimum height*
Maximum length
*The minimum height of the hot air ducting must be measured from the floor to the top of the
hot air grilles.
Figure 20
68" (1.7 m)
10' (3m) (see figure 22)
Figure 21
27

Advertisement

Table of Contents
loading

Table of Contents