Appendix 1: Hot Air Ducting Installation - Enerzone Solution 2.5-ZC Installation And Operation Manual

Us environmental protection agency phase ii certified wood fireplace
Hide thumbs Also See for Solution 2.5-ZC:
Table of Contents

Advertisement

Appendix 1: Hot Air Ducting Installation

Different hot air ducting systems can be installed with the SOLUTION 2.5-ZC:
Gravity kit
Forced air kit
Gravity Kit (AC01309)
The kit includes:
 2 x hot air outlets (grilles and frames);
o
 2 x 90
elbows with brackets;
 1 block-off plate.
The gravity kit allows you to block the upper fireplace louver. To do so, follow the steps
below:
a) Remove the upper louver from the fireplace;
b) Install the deflector as shown on figure on the left;
c) Put the upper louver back into place.
The safety rules for hot air ducting gravity kit installations are the following:
Minimum height*
Maximum length
*The minimum height of the hot air ducting must be measured from the floor to the top of
the hot air grilles.
70 Solution 2.5-ZC Fireplace Installation and Operation Manual
68" (1.7 m)
10' (3m) (see figure 22)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solution 2.5-zc eb00016

Table of Contents