I/O Check Operation - Mitsubishi GOT1000 GT15 User Manual

Graphic operation terminal
Hide thumbs Also See for GOT1000 GT15:
Table of Contents

Advertisement

14.7.3 I/O Check Operation

1
Connecting target confirmation
If touch [CPU] button, the connecting target confirmation communication check is carried out.
1
After the CPU communication starts normally, the dialog mentioned
right notifying that it is on checking, untill the connecting target
confirmation communication ends normally.
2
When the connecting target confirmation communication ends, its
result is notified by dialog.
If the connecting target confirmation communication ends normally,
the dialog notifying of the normal termination mentioned right is
displayed. If touch
[I/O check].
3
If the dialog mentioned right is displayed after selecting connecting
target confirmation or during CPU communication check, confirm the
following.
• No misconnection with CPU
(
• GOT1000 Series Connection Manual for GT Works3
and a controller used
(1.5 Verifying GOT recognizes controllers)
• GOT1000 Series Connection Manual
for GT Designer2/GT Works2
(3.3.6 Verifying GOT recognizes controllers))
• No missettings of parameter
(
10.2 Communication Detail Settings)
• No hardware error.
(
20. TROUBLESHOOTING)
If touch
button in the dialog After confirming the result, returns to [I/O check].
OK
button after confirming the result, returns to
OK
14.7 I/O Check
14.7.3 I/O Check Operation
9
10
11
12
13
14
15
16
14
- 19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got 1000Gt15

Table of Contents