Rough Pre-Operation Procedure - Mitsubishi A950GOT User Manual

Table of Contents

Advertisement

5
ROUGH PRE-OPERATION
PROCEDURE
This chapter gives a rough procedure to be performed before starting the operation of the GOT.
To transfer data through cable
Connect GOT and personal computer by
RS-232C cable.
Install personal computer-installed OS
program and monitor screen data into GOT.
1) Install basic OS, communication driver,
extension function OS into GOT.
2) Reset GOT power on completion of
installation.
3) Download screen data created on
personal computer.
START
Install GT Designer (2) into personal
computer.
Create monitor screen data.
Perform wiring to supply power to GOT.
Install the memory board (only when
necessary)
To transfer data through Compact Flash PC card/PC card
Load PC card into personal computer.
Install personal computer-installed OS
program and monitor screen data to
Compact Flash PC card/PC card.
1) Copy basic OS, communication driver,
extension function OS to PC card.
2) Copy screen data created on personal
computer to PC card.
Load Compact Flash PC card/PC card into
GOT, and install OS program and monitor
screen data (copy them to built-in memory).
Load various modules to GOT.
Make switch setting of communication
unit or communication board.
Connect cables to GOT and required
connectors.
Switch on GOT and connected system.
Start monitoring.
(Use various monitoring functions.)
COMPLETE
Get other manuals https://www.bkmanuals.com
For GT Designer:
Refer to GT Works Version /
GT Designer Version
Operating Manual (Startup Manual)
For GT Designer2:
Refer to GT Works2 Version /
.......................
GT Designer2 Version
Operating Manual
(Startup Introductory Manual)
For GT Designer:
.......................
Refer to GT Designer help function
For GT Designer2:
Refer to GT Designer2 Version
Reference Manual
.......................
Refer to Section 6.3
Refer to Section 6.4
.......................
For GT Designer:
For GT Designer2:
Refer to Chapter 6
.......................
Refer to GOT-A900 Series User's
....................
Manual
(Connection System Manual)
Refer to GOT-A900 Series Operating
.......................
Manual
(Extended Option Functions Manual)
1
2
3
4
5
Refer to GT Works
Version /GT
Designer Version
Reference Manual
Refer to GT
Designer2 Version
6
Operating Manual
7
8
5 - 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

A951gotA953gotA956got

Table of Contents