TRANSPORT - HANDLING

DELIVERY CHECKS
On receipt of a new equipment please check the following
points. It is the customer's responsibility to ensure that the
products are in good working order:
- The exterior has not been damaged in any way.
- The lifting and handling equipment are suitable for the
equipment and comply with the specifications of the
handling instructions enclosed here-in.
- Accessories ordered for on site installation have been
delivered and are in good working order.
- The equipment supplied corresponds to the order and
matches the delivery note.
If the product is damaged, exact details must be confirmed
in writing by registered post to the shipping company within
48 hours of delivery (working days). A copy of the letter
must be addressed to Lennox and the supplier or
distributor for information purposes. Failure to comply will
invalidate any claim against the shipping company.
RATING PLATE
The rating plate provides a complete reference for the
model and ensures that the unit corresponds to the model
ordered. It states the electrical power consumption of the
unit on start-up, its rated power and its supply voltage. The
supply voltage must not deviate beyond +10/-15 %. The
start-up power is the maximum value likely to be achieved
for the specified operational voltage. The customer must
have a suitable electrical supply. It is therefore important to
check whether the supply voltage stated on the unit's rating
plate is compatible with that of the mains electrical supply.
The rating plate also states the year of manufacture as well
as the type of refrigerant used and the required charge for
each compressor circuit.
BAM055NM1M
R410A
18/05/2008
BALTIC R410A-IOM-0708-E
2008
42.0 bar
Fig. 1
STORAGE
When units are delivered on site they are not always
required immediately and are sometimes put into storage.
In the event of medium to long-term storage, we
recommend the following procedures:
- Ensure that there is no water in the hydraulic systems.
- Keep the heat exchanger covers in position (AQUILUX cover).
- Keep protective plastic film in position.
- Ensure the electrical panels are closed.
- Keep all items and options supplied in a dry and clean
place for future assembly before using the equipment.
MAINTENANCE KEY
On delivery we recommend that you keep the key which is
attached to an eyebolt in a safe and accessible place. This
allows you to open the panels for maintenance and
installation work.
The locks are ¼ turn + then tighter (figure 2).
CONDENSATE DRAINS
The condensate drains are not assembled when delivered
and are stored
in the electrical panel with their clamping collars.
To assemble them, insert them on the condensate tray outlets
and use a screwdriver to tighten the collars (Figure 3).
Fig. 3