Inspection; Transport; Unpacking; Positioning - Lennox TELECOOL THN045 Installation And Operating Manual

Table of Contents

Advertisement

INSPECTION

INSPECTION
INSPECTION ON RECEIPT
On receiving the unit, check that it is perfectly intact: the unit left
the factory in perfect conditions; immediately report any signs of
damage to the carrier and note them on the Delivery Slip before
signing it.
HiRef S.p.A. or its Agent must be promptly notified of the entity
of the damage. The Customer must submit a written report
describing every significant sign of damage.
Warning: In all lifting operations make sure that the unit is securely anchored in order to
prevent accidental falls or overturning.

UNPACKING

The packing must be carefully removed to avoid the risk of
damaging the unit. Different packing materials are order to
minimise their environmental impact.

POSITIONING

Bear in mind the following aspects when choosing the best site
for installing the unit and the relative connections:
THN*D045...170 (rear view)
LIFTING AND TRANSPORT
While the unit is being unloaded and positioned, utmost care
must be taken to avoid abrupt or violent manoeuvres. The
unit must be handled carefully and gently; avoid using
machine components as anchorages or holds and always
keep it in an upright position.
The unit should be lifted using the pallet it is packed on; a
transpallet or similar conveyance means should be used.
-
positioning and dimensions of the coupling flanges;
-
location of power supply;
It is recommended to first prepare holes in the wall for the
air intake and outlet flanges.
The dimensions of the air outlet/intake flanges are shown
below:
IOM / TELECOOL THN - 0104 - E Page 5

Advertisement

Table of Contents
loading

Table of Contents