Transport - Handling - Lennox BCK 020 Installation Operating & Maintenance Manual

Baltic series
Hide thumbs Also See for BCK 020:
Table of Contents

Advertisement

TRANSPORT - HANDLING

DELIVERY CHECKS
On receipt of a new equipment please check the following
points. It is the customer's responsibility to ensure that the
products are in good working order:
- The exterior has not been damaged in any way.
- The lifting and handling equipment are suitable for the
equipment and comply with the specifications of the handling
instructions enclosed here-in.
- Accessories ordered for on site installation have been
delivered and are in good working order.
- The equipment supplied corresponds to the order and
matches the delivery note.
If the product is damaged, exact details must be confirmed in
writing by registered post to the shipping company within 48
hours of delivery (working days). A copy of the letter must be
addressed to Lennox and the supplier or distributor for
information purposes. Failure to comply will invalidate any claim
against the shipping company.
RATING PLATE
The rating plate provides a complete reference for the model
and ensures that the unit corresponds to the model ordered. It
states the electrical power consumption of the unit on start-
up, its rated power and its supply voltage. The supply voltage
must not deviate beyond +10/-15 %. The start-up power is the
maximum value likely to be achieved for the specified
operational voltage. The customer must have a suitable
electrical supply. It is therefore important to check whether
the supply voltage stated on the unit's rating plate is compatible
with that of the mains electrical supply. The rating plate also
states the year of manufacture as well as the type of refrigerant
used and the required charge for each compressor circuit.
Page 4 - IOM / ROOFTOP BALTIC Series - 0803 - E
STORAGE
When units are delivered on site they are not always required
immediately and are sometimes put into storage. In the event
of medium to long-term storage, we recommend the following
procedures :
- Ensure that there is no water in the hydraulic systems.
- Keep the heat exchanger covers in position (AQUILUX cover).
- Keep protective plastic film in position.
- Ensure the electrical panels are closed.
- Keep all items and options supplied in a dry and clean place
for future assembly before using the equipment.
MAINTENANCE KEY
On delivery we recommend that you keep the key which is
attached to an eyebolt in a safe and accessible place. This
allows you to open the panels for maintenance and installation
work.
The locks are ¼ turn + then tighter (figure 2).
CONDENSATE DRAINS
The condensate drains are not assembled when delivered and
are stored
in the electrical panel with their clamping collars.
To assemble them, insert them on the condensate tray outlets
and use a screwdriver to tighten the collars (Figure 3).
Fig. 1
Fig. 2
Fig. 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents