Lennox BAC020SNM Installation, Operating And Maintenance page 35

Table of Contents

Advertisement

ARRANGEMENT DRAWINGS
WITH OPTIONS
(Return and supply opening shown on this drawing do apply to BAC/BAH
with electric heater or hot water coil )
1D
Down supply air
1F
Front supply air
2D
Down return air
2F
Front return air
(*) Total Length (unit + option)
BALTIC R410A-IOM-0708-E
3
Fresh air
4F
Front main power entry
Down main power
4D
entry
BAG
BAM
6
Gas supply inlet
71
Outdoor coil inlet
70
Outdoor coil outlet
045
055
8
Extraction
9
Smoke outlet
10
Condensate drainage
Page 34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents