DIESEL EQUIPMENT
13
Injector rail
REFITTING
Position the injection rail and finger-tighten the mounting bolts (the rail should
be floating).
Position all the HP pipes and finger-tighten them.
Tighten:
– all the HP injection pipe connections (on the injector side (1) then on the
injection rail side (2).
– the rail bolts (3).
– the HP pump/rail pipe (4).
16192R1
13-29