Renault 2000 Megane Technical Note page 36

F9q 732 engine
Hide thumbs Also See for 2000 Megane:
Table of Contents

Advertisement

– the low pressure pump connector,
– the bolts (1) and (2),
– the alternator mounting bolts and remove the
alternator, then remove the bolts (3).
Loosen the exhaust pipe clamp mounting.
Remove:
– the catalytic converter mountings on the pre-catalytic
converter,
– the pre-catalytic converter stay (1),
– the mounting (6),
– the oil supply pipe at (7) and remove towards the
bulkhead,
– the pre-catalytic converter mountings to the turbo,
– the catalytic converter removing the engine towards
the cooling system,
– the oil return pipe (8),
TOP AND FRONT OF ENGINE
Cylinder head gasket
PRF1103
16155R
11-10
– the bolt (9) and loosen the other mounting bolts on
the lower timing cover without removing them,
– cylinder head bolts.
Release the cylinder head by setting aside the lower
part of the camshaft housing, without causing the
cylinder head to turn, since this is centred by the two
dowels.
11
16156R2
12521-1R3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

MeganeScenic

Table of Contents